国产喷浆抽搐高潮视频_久久av小草影院强奸_看久久久一级无码毛片_亚洲a∨无码天堂网

Home > Project information > Project information details
Project information details
Ningbo-Taizhou-Wenzhou Shield and Pipe Jacking Project
Zhong Hai Lin   |   2017-03-27   |   views:2861

The total length of the Ningbo-Taizhou-Wenzhou shield and pipe jacking project tunnel is 461.5m and the inner diameter is 3m.After the tunnel has been built up, a natural gas pipeline with a diameter of 813 mm and a product oil pipeline with a diameter of 406.4 mm will be laid, thus the history of no direct natural gas supply in Zhejiang coastal areas has been ended, and the complementary gas supply of annular pipe network in Yangtze River Delta is realized.

Project picture